Current page: Indoor airPLUS §Moisture Control — bulk water management
GuidelineRecommended

Bulk water management: site drainage 6 in/10 ft away, capillary break above foundation, drainage plane behind cladding

Indoor airPLUS §Moisture Control — bulk water management

Description

Indoor airPLUS requires bulk-water management at every envelope boundary: site graded ≥ 6 in fall in the first 10 ft (5%) away from the foundation; gutters + downspouts discharging ≥ 5 ft from foundation; capillary break (sill seal, rigid foam, sheet membrane) above the foundation wall; drainage plane behind ALL exterior cladding (rain-screen detail required for stone / brick / large-format claddings); flashing at all wall penetrations.

Why this exists

Water in walls + foundations is the #1 trigger of mold + IAQ problems. The airPLUS bulk-water rules are the architect's design checklist for keeping water OUT of the assembly. Combined with the ENERGY STAR water-management items, this is the most comprehensive residential moisture-protection spec available for free.

Categories

StructureSiteVentilation

Source

US EPAno manifest entry
Indoor airPLUS Construction Specifications (Version 2 / Version 1 Rev 4)
Section: Moisture Control — bulk water management
Published 2024-01-01 · last verified 2026-05-15

Solver enforcement

Browsable only — the solver does not currently enforce this directive (no spec-level data to check against). This entry exists so the architect personas can cite it in conversation and the user can read what the rule says.

Related directives

Last reviewed 2026-05-15.